- Industrial building and new concrete retaining wall supporting a track ramp to the second floor
- Installation of a blast wall and new liquid hydrogen tank
- Industrial truck wash featuring a safety rack to support lifted truck bodies
- New retaining wall using pre-cast concrete lagging in steel wide flange posts
- Complete seismic rehab of 100 year old 2-Story residence
- Residence Redwood Deck
- Truck scales
Pages 1 2